Logging Repair Project

The logging Repair project is on hold for now until it’s placed in a permanent location on the layout. This is my first attempt of board by board construction with strip wood made on a table saw. The base ground color is #1090 Cumbres Earth, #1183 Oak Creek Orange ballast and dabs of other Az Rock products to enhance the scenery.

The scenery was done before the structure was built. A future rail spur is modeled with the graded roadbed, ties and spike kegs waiting for the track gang to lay the ties and rail.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>